Ingwa Hydropower Limited, a company established and incorporated for the development and operation of hydro and solar projects to generate and supply electricity to National grid as its prime objective. The company has successfully constructed and operating its 9.7 MegaWatt, Mathilo Ingwa Khola Hydroelectric Project a run off river type project in Ingwa river, a tributary of Kabeli river located at Yangbarak Municipality, Panchthar district of Province 1 in the eastern region of Nepal. The major promoter/investor behind this company is Api Power Company Limited, a leading company in Nepal's Power Sector with Power Generation and Supply to National Grid as its core business. Api Power Company Limited has invested NPR 15.00 crores and has owned the 25% stake holding in the Company. As a Promoter in this Ingwa Hydropower Limited Api Power Company Limited invest Equity required for the development of the Projects owned.
Geographically the Project is located between the Latitude 270 16' 46" to 270 17' 20” North and longitude: 870 52' 22" to 870 55' 20" East. The intake and powerhouse sites lie in the Panchthar District at altitudes of 1106.5m amsl and 911 m amsl respectively. The effective catchment area of Ingwa River at the proposed intake site is around 202 km2. Based on the hydrological analysis, a design discharge of 6.21 m3/s is derived at 45.97% probability of flow exceedance.
A free flow ogee shaped diversion weir of 5m height from river bed and 45m long weir is designed for intake at EL 1106.5m amsl. The diversion weir and its appurtenances are designed considering a one in 100-year high flood event whose magnitude is estimated to be 1129 m3/s. Powerhouse of the project is located at EL 911m amsl near Ambot, Yangwarak R. Municipality, Panchthar.
With the available gross head of 195.5m and considering the losses in water conveyance, a net head of 182.15m is available at Powerhouse. Two units of horizontal axis Francis turbines 5.057 MW (each) is designed to generate 9.7 MW power at design discharge of 6.21 m3/s and 182.15m head. 16 km long 33 kV double circuit transmission line is being erected to evacuate the power from the switchyard to NEA’s substation at Kabeli Substation, Pachthar district. The total annual energy generation from the plant will be 61.84GWh. However, the annual energy available for sale excluding all possible outages at 4% would be 59.37 GWh, out of which 50.46 GWh is the wet seasonal energy and 8.91 GWh is the dry seasonal energy.
The company has obtained survey license of the Project from the Department of Electricity Development, Ministry of Energy and completed the Detailed Survey of the Project. Company has entered into the Power Purchase Agreement with Nepal Electricity Authority on dated 18th Ashwin, 2078 B.S. The IEE has already been approved by the Ministry of Energy and the Land acquisition for the Project has been completed. Company has obtained the Generation Licence from Ministry of Energy, Department of Electricity Development (DOED) on dated 28th Kartik, 2077 B.S.
Name of Project : Mathilo Ingwa Hydro Power Project
Name of River : Ingwa Khola
Project Location
District : Panchthar
Geographical coordinate : Latitude 27°16’46” N to 27°17’20” N , Longitude 87°52’22” E to 87°55’20” E
Intake : Khudibari, Yangwarak R. Muncipality, Pancthar
Powerhouse : Ambot, Yangwarak R. Municipality, Panchthar
Hydrology
Catchment Area at Dam Site : 202 km²
Mean Annual Precipitation : 2236 mm
Mean Annual Flow : 13.21 m³/s
Design Flood (1 in 100 yr.) : 1129 m³/s
Power Generation
Type of Project : Run-of-river
Turbine Discharge : 6.21 m³/s
Total Gross Head : 195.50 m
Net Head : 182.15 m
Installed Capacity : 9.7 MW
Average Annual Energy : 59.37 GWh
Dry Energy : 8.91 GWh
Wet Energy : 50.46 GWh
Diversion Weir
Type of weir : Free flow ogee shape
Length of weir : 45.00m
Height of weir : 5.00m
Invert level : 1101.50m
Weir crest level : 1106.50m
Under sluice
Nos. of bay : 2
Width : 2.00m
Height : 3.50
Design discharge : 15% of flood discharge
Invert level : 1101.00m
Top level of structure : 1112.06m
Intake
Type : Side intake
Nos. of orifice : 3
Width : 1.70m
Height : 2.40m
Invert level : 1104.00m
Spillway
Width : 12.50m
Depth : 1.85m
Invert level : 1106.50m
Approach canal & connecting canal
Approach canal type : Free flow, Rectangular RCC
Nos. : 1
Width : 1.75m
Height : 2.65m
Length : 19.3m
Slope of bed : 1V:500H
Invert level at start : 1104.10m
Invert level at end : 1104.07m
Settling basin
Nos. of bay : 2 bay with hopper type, Intermittent flushing
Particle to be settled : >=0.2mm
Inlet transition Length : 12.00m
Width of each bay : 6.50m
Overall depth : 5.83m
Settling Length : 56.00m
Invert level at start of transition : 1104.18m
Invert level at end of transition : 1100.34m
Bed slope : 1V:50H
Bed width : 0.80m
Bed height : Varying
Invert level at end of settling basin : 1099.14m
Head pond
Width : 10.75m
Depth : 3.50m
Length : 13.20m
Total depth : 8.30
Water level : 1106.18m
Invert level : 1098.38m
Surge pipe
I.D : 1.80m
Thickness of pipe : 10mm to 20mm
Length : 312.10 m
Surge tank
Upsurge level : 1108.00
Down surge level : 1057.81
Size
Length : 15.00m
Width : 6.00m
Penstock pipe
I.D : 1.70m
Length : 157.58 m
Thickness of pipe : 18mm to 20mm
Bifurcation pipe
I.D : 1.20
Total Length : 32.00
Thickness of pipe : 14mm
Powerhouse
Type : Semi Surface
Type of turbine : Francis turbine with horizontal axis
No. of units : 2
Size (L*B*H) : 30.0m*16.5m*13.5m
Tailrace
Type Closed : RCC canal
Width : 2.00
Height : 2.20
Length : 53.0 m
Financial
IRR on investment : 14.55%
IRR on Equity : 18.51%
B/C : 1.350
NPV : 650.071Million
DSCR : 1.5390
Project Cost : NRs.1,988,265,589