Upper Naugarh Gad Small Hydroelectric Project is a Run-Off-River type project which is developed by Api Power Company Limited. The project is located at 5km upstream of Naugarh Gad Hydroelectric Project (8.5MW) Intake which had been succefully constructed and operated by the same Company. The Project is located in Dhuligada and Shikhar VDC's of Darchula district in the Far Western Development Region of Nepal. Geographically, the site is located between Latitude 29044'18''N to 29043'25''N and Longitude 80039'48''E to 80036'26''E. The Headworks and the Powerhouse are located at an elevation of 1040.20m and 877.0m from mean sea level. The Project has installed capacity of 8MW with 163.44m of gross head and 6.43 m3/s at 40% of exceedence. The Project is accessible from Gokuleshwor to Headworks area as there is existing acess road. The powerhouse consists of two units of 4000 kW Francis turbines connected to two units of 4150 kVA generators which generate the electricity. The power is evacuated through 33 kV transmission line (9 km) which is connected to the Balanch Substation of Chameliya Hydroelectric Project, NEA.
The company has obtained survey license of the Project for 8 MW on dated 7th Jestha, 2071 from the Department of Electricity Development, Ministry of Energy and completed the Detailed Survey of the Project. Company has entered into the Power Purchase Agreement with Nepal Electricity Authority on dated 12th Kartik, 2073 B.S. The IEE has already been approved by the Ministry of Energy and the Land acquisition for the Project has been completed. Company has obtained the Generation Licence from Ministry of Energy, Department of Electricity Development (DOED) on dated 14th Poush, 2073 B.S.
The Project has started its Commercial Operation from 13th Kartik, 2076 B.S. (30th October, 2019).
Project Details | |
---|---|
Project Name | : Upper Naugarh Gad Hydroelectric Project |
Development Region | : Far Western |
Zone | : Mahakali |
District | : Darchula |
Intake Site | : Shikhar VDC |
Powerhouse Site | : Dhuligada VDC |
Geographical Co-ordinates | |
Latitude | : 29°44'18" N to 29°43'25" N |
Longitude | : 80°39'48" E to 80°36'26" E |
General | |
Water Source | : Naugarh Gad and Gadi Gad (Mauli Khola) |
Nearest Town | : Gokuleshwor |
Type of Scheme | : Run-of-river |
Gross Head | : 163.44 m |
Net Head | : 144.0 m |
Installed Capacity | : 8,000 kW |
Hydrology | |
Catchment Area | : 171.8 km2 |
Average Annual Precipitation | : 2192 mm/year |
100 years Design Flood (HW) | : 498 m3/s |
100 years Design Flood (PH) | : 563 m3/s |
Minimum Monthly Flow | : 2.71 m3/s |
Riparian Release Intake | |
Naugarh Gad | : 0.233 m3/s |
Mauli Collection | : 0.38m3/sec |
Headworks | |
Diversion Structure | : Hard Stone Lined Gravity Free Flow Weir |
Type of Weir | : Concrete gravity dam |
Length of Weir | : 22 m |
Weir Crest Elevation | : EL 1040.20 msl |
Height of Weir | : 2.50 m from U/s Apron |
Undersluice | : 1 Vertical Sluice Gates |
Crest of Sluice | : EL 1037.70 msl |
Size of Sluice Gate (b x h) | : 2.50 m x 2.00 m |
Intake Type | : Side Intake |
Size of Opening | : 2.20 x 0.90 – 3 nos |
Crest Elevation of Intake | : EL 1039.20 msl |
Gravel Trap | |
Type | : Rectangular |
No. of bays | : 1 |
Particle Size to be Settled | : 50 mm |
Trap Efficiency | : 98 % |
Size of Gravel Trap (LxBxH) | : 15.00 m x 5.00 x (1.75 m – 3.25 m) |
Spilway Length | : 14.80 m |
Bed Slope | : 1:10 |
Flushing Channel Size | : 1 Nos. of 1.0 m x 1.0 m Rectangular Closed |
Desander | |
Type | : Double Dufour Double Chamber Continuos Flushing Type |
Trap Efficiency | : 90% |
Size of Each Chamber (LxBxH) | : 55.0 m x 6.80 m x (4.45m – 6.50m) |
Bed Slope | : 1:50 |
FSL @ Desander end | : 1040.00 msl |
Flushing Channel Size | : 2 Nos. of 0.80 m x 0.80 m Rectangular |
Headworks at Mauli Khola | |
Diversion Structure | : Hard Stone Lined Gravity Free Flow Weir |
Length of Weir | : 13.30 m |
Weir Crest Elevation | : EL 1045.00 msl |
Height of Weir | : 1.0 m from U/S Apron |
Undersluice | : 1 Vertical Sluice Gate |
Crest of Sluice | : EL 1043.50 msl |
Size of Sluice Gate (b x h) | : 2.00 m x 1.50 m |
Intake Type | : Side Intake with orifice opening |
Size of Intake | : 4.80 x 0.50 - 1 |
Crest Elevation of Intake | : EL 1044.55 msl |
Approach Canal | |
Type | : Closed Rectangular Canal |
Length | : 65 m |
Size (b x h) | : 1.20 m x 1.20 m |
Bed Slope | : 1:250 |
Desander | |
Type | : Flat Bed Continuous Flushing |
Chamber | : 2 Nos |
Particle Size to be settled | : 0.20 mm |
Trap Efficiency | : 90% |
Size of Each Chamber(l x b x h) | : 36 m x 3.70 m x (1.70 m - 3.50 m) |
Bed Slope | : 1:50 |
FSL at Desander end | : 1044.59 msl |
Flushing Channel Size | : 2 Nos of 0.50 m x 0.50 m Rectangular |
Headrace Pipe | |
Type | : MS-Pipe beried Section |
Total Length | : 5149.85 m |
Pipe Material | : IS 2062-B |
Thickness | : 8 mm to 16 mm |
Diameter of Pipe | : 1.70 - 1.65 m ID |
Mauli Collection Pipe | |
Total Length | : 1236.173 m |
Type | : MS-Pipe Buried Section |
Pipe Material | : IS 2062-B |
Thickness | : 6 mm - 8 mm |
Diameter of Pipe | : 0.80 - 0.7 m |
Surge Tank | |
Type | : Surface, RCC Rectangular |
Number of Chamber | : 2 (Lower and Upper) |
Size | |
Lower Tank (L x B x H) | : 22.5 m x 8.00 m x 8.00 m |
Upper Tank (L x B x H) | : 22.5 m x 8.00 m x 8.00 m |
Steady State Level | : 1023.10 masl |
Upper Surge Level | : 1047.70 masl |
Down Surge Level | : 1019.12 masl |
Invert Level | |
Lower Surge Tank | : 1015.40 masl |
Upper Surge Tank | : 1040.00 masl |
Penstock Pipe | |
Type | : MS-Pipe Open Structure |
Length | : 181.5 m from T to Surgetank and 233.00m from T to Powerhouse |
Pipe Materialize | : IS 2062-B |
Size of Pipe | :1.65~1.17m 16 to 20mm thick(T-ST) &1.50m, 14 to 8mm thick(T-PH) |
Powerhouse | |
Type | : Surface |
PH Dimensions, main Building (l x b) | : 30.50 m x 16.00 m |
Height of PH Building | : 11.50 from Plinth Level |
PH Floor Level | : EL 878.50 m |
Tailrace | |
Type | : Closed Rectangular RCC Canal |
Length | : 70 m |
Size (w x h) | : 2.5 m x 2.80 m |
Tailrace Water Level | : 876.76 m |
Slope | : 1:500 |
Turbine | |
Type of Turbine | : Francis |
Number | : Two (2) |
Shaft Arrangement | : Horizontal |
Rated Discharge for each Turbine | : 2.7 m3/s |
Rated head | : 145.43 m |
Rated Output for each Unit | : 3650 kW |
RPM | : 1000 |
Rated Efficiency | : 90 % (at 100% Discharge) |
Generator | |
Type | : Synchronous brushless, 3Ø AC |
No of Units | : 2 |
Rated Voltage | : 6.3 kVA |
Power Factor | : 0.85 |
Layout | : Horizontal |
Rated Efficiency | : 96% |
Rated Output | : 4150 kVA |
Rated Frequency | : 50 Hz. |
Power Transformer | |
Type | : Step up Power Transformer |
Rated Capacity | : 10000 kVA |
Rated Efficiency | : 99% |
No of Unit | : 1 |
Number of Phases | : 3 ph, 50 Hz |
Types of Connection | : Star/Delta |
Type of Cooling | : ONAN |
Voltage Ratio | : 6.3 kV (LV Side) / 33 kV (HV Side) |
Station Supply Transformer | |
Type | : Indoor and Outdoor Type |
Rate Power Output | : 200 kVA |
No of Unit | : 2 |
Type of Cooling | : ONAN |
Voltage Ratio | : 6.3/0.4 kV |
Connection / Vector Group | : Dyn11 |
Transmission & Interconnection | |
Power House – Balanch Substation | : 7 km |
Type of Circuit | : 33 kV Single Circuit Line up to 132 kV Balanch S/S |
Line Conductor | : ACSR "DOG" |
Transmission Voltage | : 33 kV |
Proposed Interconnection Point | : Balanch 33/132 kV Substation |
Power and Energy | |
Installed Capacity | : 8.00 MW |
Total Gross Energy | : 51.69 GWh |
Contract Energy after Outage & Loss | : 49.10 GWh |
Wet Saleable Energy | : 39.40 GWh (79.27%) |
Dry Saleable Energy | : 12.29 GWh (20.73%) |
Project Financial Indicators | |
Base Cost of the Project | : 1272.404 Millions NRs(Without IDC) |
Cost After Financing | : 1738 |
Loan/ Equity Ratio | : 70:30 |
Interest Rate | : 11 % |
Internal Rate of Return | : 16.72% |
Simple Payback Period | : 5.15 years |
B/C Ratio | : 1.51 |
Return of Equity | : 26.17% |
Cost per MW | : 17.38 Crores/MW after Financing |